History

2024 Reorganization to the Laboratory for Zero-Carbon Energy, Institute of Integrated Research, Institute of Science Tokyo
2021 Reorganization to the Laboratory for Zero-Carbon Energy, Institute of Innovative Research
2016 60th Anniversary from Establishment
2016 System Modification for Laboratory for Advanced Nuclear Energy, Institute of Innovative Research. Abolition of Center for Research into Innovative Nuclear Energy Systems. Integration of International Nuclear Research Cooperation Center.
2014 Adoption of Program for Research and Education for Nuclear Decommissioning "Advanced Research and Education Program for Nuclear Decommissioning"
2011 Adoption of Program for Leading Graduate Schools "Global Nuclear Safety and Security Agent"
2010 Establishment of International Nuclear Research Cooperation Center
2006 Establishment of Center for Research into Innovative Nuclear Energy Systems (Attached to Tokyou Institute of Technology)
2010 International Nuclear Research Cooperation Center
(Director, a Professor and an Associate Professor)
2008 Establishment of Cooperative Chairs for RIKEN
(Two Coordinate Professors and a Coordinate Associate Professor)
2004 Establishment of Cooperative Chairs for Innovative Nuclear Reactor Engineering
(Two Coordinate Professors and a Coordinate Associate Professor)
2003 Adoption of the 21st Century COE Program "Innovative Nuclear Energy Systems for Sustainable Development of the World"
2003 Establishment of Cooperative Chairs for Back-end Engineering
(Two Coordinate Professors and a Coordinate Associate Professor)
1995 Installation of Radiation Monitoring System
1995 Installation of Dual Mode Phase Doppler Anemometry System
1995 Establishment of a foreign guest professor at System and Safety Engineering Division
1993 Installation of High-Sensitivity Analyzer of Nuclear Transmutation Reactions by Particle Beams
1991 Installation of Mass Transmutation Facilities with High-Quality Particle Beams
1990 Reorganization of Research Laboratory for Nuclear Reactors, (3-Broad-Division Organization)
1987 Installation of Nuclear Ceramics Facilities
1985 Establishment of Blanket Safety Engineering Division,
(10-Year Limit, Change of Nuclear Reactor Safety Engineering Division)
1982 Installation of Blanket Engineering Facilities (4-Year Plan)
Installation of Facility for Non-Steady Blanket Simulation Experiments (First Year)
Installation of Heavy Ion Linac System (2nd Year)
Installation of Facility for Blanket Breeding Experiments (3rd and 4th Years)
1980 Establishment of Tritium Chemistry Division (10-Year Limit, 11-Division Organization)
1978 Establishment of Nuclear Reactor Safety Engineering Division
(7-Year Limit, 10-Division Organization)
1975 Radiation Physics Division (Renamed, Old Name: Health Physics Division)
1974 Construction of Multi-Purpose Irradiation Facilities Laboratory (3-Year Plan)
Installation of Multi-Purpose Irradiation Facilities
1970 Construction of High-Temperature Nuclear Fuel Elements Laboratory (2-Year Plan)
Installation of High-Temperature Nuclear Fuel Elements Facilities
Establishment of Nuclear Fuel Division (9-Division Organization)
1967 Construction of Isotope Separation Laboratory (2-Year Plan, Present Name: Isotope Science Laboratory)
Installation of Isotope Separation Facilities,
Establishment of Reactor Design Division (8-Division Organization)
1965 Extension of the Main Building of the Research Laboratory
Construction of Nuclear Power Laboratory (2-Year Plan), Installation of Nuclear Power Facilities
1964 Establishment of the Research Laboratory for Nuclear Reactors, Tokyo Institute of Technology
(7-Division Organization)
1963 Construction of Main Building of the Research Laboratory
1962 Construction of Radio Isotope Laboratory
1961 Construction of Fission Experiment Facility Research Laboratory (2-Year Plan)
Installation of Subcritical Experiment Facility for 20% Enriched Uranium - Light Water System
1960 Installation of Exponential Experiment Facility for Natural Uranium - Light Water System
1959 Construction of Atomic Science Laboratory
Installation of Cockcroft-Walton Accelerator, Installation of Atlas Mass Spectrograph
1957 Establishment of Department of Nuclear Engineering in Graduate School of Science and Engineering
1956 Establishment of the Research Laboratory for Nuclear Reactors, the Faculty of Science and Engineering, Tokyo Institute of Technology
(2-Division Organization at First, 7-Division Organization Later)