2024 | Reorganization to the Laboratory for Zero-Carbon Energy, Institute of Integrated Research, Institute of Science Tokyo |
2021 | Reorganization to the Laboratory for Zero-Carbon Energy, Institute of Innovative Research |
2016 | 60th Anniversary from Establishment |
2016 | System Modification for Laboratory for Advanced Nuclear Energy, Institute of Innovative Research. Abolition of Center for Research into Innovative Nuclear Energy Systems. Integration of International Nuclear Research Cooperation Center. |
2014 | Adoption of Program for Research and Education for Nuclear Decommissioning "Advanced Research and Education Program for Nuclear Decommissioning" |
2011 | Adoption of Program for Leading Graduate Schools "Global Nuclear Safety and Security Agent" |
2010 | Establishment of International Nuclear Research Cooperation Center |
2006 | Establishment of Center for Research into Innovative Nuclear Energy Systems (Attached to Tokyou Institute of Technology) |
2010 | International Nuclear Research Cooperation Center (Director, a Professor and an Associate Professor) |
2008 | Establishment of Cooperative Chairs for RIKEN (Two Coordinate Professors and a Coordinate Associate Professor) |
2004 | Establishment of Cooperative Chairs for Innovative Nuclear Reactor Engineering (Two Coordinate Professors and a Coordinate Associate Professor) |
2003 | Adoption of the 21st Century COE Program "Innovative Nuclear Energy Systems for Sustainable Development of the World" |
2003 | Establishment of Cooperative Chairs for Back-end Engineering (Two Coordinate Professors and a Coordinate Associate Professor) |
1995 | Installation of Radiation Monitoring System |
1995 | Installation of Dual Mode Phase Doppler Anemometry System |
1995 | Establishment of a foreign guest professor at System and Safety Engineering Division |
1993 | Installation of High-Sensitivity Analyzer of Nuclear Transmutation Reactions by Particle Beams |
1991 | Installation of Mass Transmutation Facilities with High-Quality Particle Beams |
1990 | Reorganization of Research Laboratory for Nuclear Reactors, (3-Broad-Division Organization) |
1987 | Installation of Nuclear Ceramics Facilities |
1985 | Establishment of Blanket Safety Engineering Division, (10-Year Limit, Change of Nuclear Reactor Safety Engineering Division) |
1982 | Installation of Blanket Engineering Facilities (4-Year Plan) Installation of Facility for Non-Steady Blanket Simulation Experiments (First Year) Installation of Heavy Ion Linac System (2nd Year) Installation of Facility for Blanket Breeding Experiments (3rd and 4th Years) |
1980 | Establishment of Tritium Chemistry Division (10-Year Limit, 11-Division Organization) |
1978 | Establishment of Nuclear Reactor Safety Engineering Division (7-Year Limit, 10-Division Organization) |
1975 | Radiation Physics Division (Renamed, Old Name: Health Physics Division) |
1974 | Construction of Multi-Purpose Irradiation Facilities Laboratory (3-Year Plan) Installation of Multi-Purpose Irradiation Facilities |
1970 | Construction of High-Temperature Nuclear Fuel Elements Laboratory (2-Year Plan) Installation of High-Temperature Nuclear Fuel Elements Facilities Establishment of Nuclear Fuel Division (9-Division Organization) |
1967 | Construction of Isotope Separation Laboratory (2-Year Plan, Present Name: Isotope Science Laboratory) Installation of Isotope Separation Facilities, Establishment of Reactor Design Division (8-Division Organization) |
1965 | Extension of the Main Building of the Research Laboratory Construction of Nuclear Power Laboratory (2-Year Plan), Installation of Nuclear Power Facilities |
1964 | Establishment of the Research Laboratory for Nuclear Reactors, Tokyo Institute of Technology (7-Division Organization) |
1963 | Construction of Main Building of the Research Laboratory |
1962 | Construction of Radio Isotope Laboratory |
1961 | Construction of Fission Experiment Facility Research Laboratory (2-Year Plan) Installation of Subcritical Experiment Facility for 20% Enriched Uranium - Light Water System |
1960 | Installation of Exponential Experiment Facility for Natural Uranium - Light Water System |
1959 | Construction of Atomic Science Laboratory Installation of Cockcroft-Walton Accelerator, Installation of Atlas Mass Spectrograph |
1957 | Establishment of Department of Nuclear Engineering in Graduate School of Science and Engineering |
1956 | Establishment of the Research Laboratory for Nuclear Reactors, the Faculty of Science and Engineering, Tokyo Institute of Technology (2-Division Organization at First, 7-Division Organization Later) |